Survey Management
REMOVE UNCERTAINTY WITH DATA AS YOU DRILL
Drilling practices alone are not enough to accurately
deliver a high quality wellbore, as success is equally dependent on the
accuracy of the wellbore survey. H&P’s Survey Management increases the
accuracy and consistency of how we measure boreholes, enabling the delivery of
any outcome that relies on knowledge of the wellbore position or shape. These
outcomes include landing a curve, properly spacing laterals, safely performing
collision avoidance operations, and updating well plans and geological models
to accurately reflect data that was measured while drilling.
Accurate, Consistent, and Reliable Wellbore Surveys
By reducing the magnitude of survey errors commonly
encountered during drilling operations and through the early identification and
elimination of gross errors related to the surveying process, Survey Management
improves the accuracy, consistency and reliability of wellbore positioning
operations.
H&P provides a pre-job report confirming basic well
details and aligning operations on initialization of survey instruments. During
drilling, real-time corrections of the survey data are performed and once the
well is finished a post-job analysis of what occurred is provided so that
operators can have greater confidence that survey execution was performed to
their expectations. This helps eliminate gross errors that may directly
contribute to major adverse events such as sidetracks, missed landing points and
wellbore collisions. Reducing gross errors will in turn reduce the frequency of
those negative outcomes.
Reducing survey uncertainty can:
· Expand the safe operating envelope available to a driller
when performing collision avoidance operations
· Drive more precise spacing of laterals
· Enable more accurate total vertical depth (TVD) estimation
both when landing the curve and drilling the lateral
SMOOTH OPERATIONAL PROCESS ENABLES PAINLESS
IMPLEMENTATION
· Automated quality control and data processing
· API connections to third party software
· Trusted, technical experts provide procedures and best
practices to help ensure survey success
· Operations to scale without compromising service quality
PROOF POINTS
Figure 1: Reduce Bottomhole Uncertainty By Up To 60%
ACCURACY COMPARISON - MAGNETIC DECLINATION
Main field model: 0.8-1.0 deg at 2σ
High-def model: 0.68 deg at 2σ
IFR1 model: 0.32 deg at 2σ
IFR1+GS Model: 0.16 deg at 2σ
Figure 2: HIGH-DEFINITION MODELS + IN-FIELD REFERENCING +
DIRECT OBSERVATION = EXTREME ACCURACY
Download the full product literature from here: https://www.helmerichpayne.com/media/product-literature/Survey-Management.pdf.
Reach out to our H&P Sales Representative directly for
better drilling outcomes: https://www.helmerichpayne.com/contact.
.png)
.png)
Comments
Post a Comment